    Tabesh Raad Company will perform after-sales services and possible repairs without a limited period, based on its commitment to the employer in front of its products.

    ” Instructions for use, maintenance and repairs ”

    Dear consumer :

    Since the basic maintenance of the electrical panel increases its lifespan and optimal use, please pay due attention to the items listed in this instruction.

    1. Check the serial number of the board with other available documents.
    2. The board should be installed levelly and with sufficient strength in its place.
    3. As some connections may have loosened during shipping, make sure the internal connections are tight.
    4. The external connections of the panel (input and output cables) must also be secure and strong, check this as well.
    5. Before energizing the board, carefully inspect its interior again to ensure that no foreign objects enter near the busbars and other energized parts.
    6. Before powering up the board, clean all the equipment from dust and…
    7. Do not open the screws of the body or the plates of the equipment and avoid using it for other purposes.
    8. It is not correct to connect any cable directly to the busbar and avoid this.
    9. The input and output cables must be secured by the clamps in the panel to prevent tension on the equipment contacts and their damage.
    10. If you need to change or replace the fuse, be sure to use the standard and approved type.
    11. Do not use long and non-standard screws to connect the cables to the outputs.
    12. If any of the output fuses are damaged due to short circuit or high current, be sure to completely clean the damaged fuse switch from the circuit and around it, because its presence will again cause current leakage to the body and short circuit.
    13. If you notice a current leakage or abnormal sound when connecting the main automatic switch, you must try to fix the problem first, then connect the switch.
    14. Never remove the protective fuses of the street lighting line from the circuit.
    15. In order to prevent dust from entering the board, make sure that there are filters in the place of the board’s vents.
    16. The main automatic switch needs to be serviced after 3 to 5 TRIPs under rated short-circuit current, so be sure to write down the times of disconnection and connection due to short-circuit in the identification card of the panel.
    17. Setting of protection relays must be done by experts.
    18. It is very dangerous to make changes or… while connecting the main key. (even the seemingly simple act of changing the lamp inside the panel) because there is a possibility of an object or tool falling on the BUS BARS, so avoid this.
    19. After finishing the work, make sure that the panel door is closed.
    20. The inside of the panel must be dusted once every 6 months.
    21. For longer durability, grease the lock and hinge of the body of the panel every year, as well as stain the damaged areas.
    22. Making changes in the warranty period must be done with the coordination of this company.

    Our services

    Our effort is to satisfy our customers.

    Product warranty

    The compact panels made by the company have a warranty for 18 months.

    Education

    Tabesh Raad Company conducts training courses in the fields of training, installation and repair of compact panels and posts.

    Instructions for installing the transformer in the transformer cell

    Tabesh Raad Company conducts training courses in the fields of training, installation and repair of compact panels and posts.

    1- First, open the door of the transformer cell (TR), the rail is installed in the front of the cell, by opening two of the screws, we turn it outwards by 90 degrees, then move the mobile rail legs vertically on the ground. We make columns.

    2- We place the transformer on the rail, then direct it to the inside of the cell. Trans should be located in the center of the cell. The placement of the trans inside the cell is such that the side of the trans where the oil tank is installed is located at the end of the cell and the secondary bushings of the trans cell side (LV) and the primary bushings of the trans cell side (MV).

    3- After placing the transformer in the right place, we install the wheel steps, one at the back and one at the front, in a crosswise manner and tighten its screws to the fixed rail of the transformer. This prevents the transformer from moving back and forth. slow

    4- We connect the cables related to the primary and secondary transformer, Buchholz relay and thermometer to the relevant bushings and terminals.

    5- In the last step, we return the moving rail of the trans to its original state and tighten its screws.

    Instructions for disconnecting and connecting non-disconnectable sectioners and degenerators

    Connection command:

    First, close the entrance door, so that it locks completely, then put the handle in place of the earthing shaft, turn it counterclockwise to remove the sectioner from the earthing mode (after earthing, a mechanical interlock is established, which does not open the door in any way) can’t). After earthing, remove the handle from the earthing shaft. Turn the switch on the sectioner counterclockwise to open the connecting and disconnecting shaft inlet valve. Place the handle in the disconnecting and connecting shaft by turning the sectioner shaft clockwise. It connects then remove the handle. (Hand pressure should be enough to remove the handle easily). After connecting the sectioner, move the switch to the degenerator probe. Turn the switch counterclockwise. After charging the spring, you can connect the degenerator by pressing the green button (ON).

    Interrupt command:

    To turn off the degenerator, press the red button (OFF) and the degenerator will be turned off. While holding the button (OFF), turn the switch 180 degrees clockwise and remove the degenerator from the socket and insert it into the sectioner and turn the valve counter-clockwise. The shaft entrance is opened by placing the handle in the sectioner shaft and by turning it counterclockwise, the sectioner is cut off. After disconnecting the sectioner, put the handle in the place of the earth shaft and turn it clockwise until it is earthed, now you can open the door.

    Instructions for carrying and installing the compact post

    Connect the straps completely flat so that they are at least one meter higher than the roof of the shed

    Then we close the post doors completely and fix them together with bolts and nuts. It should be noted that during this work, if there is a transformer in the post, its connections should also be carefully checked.

    Connect the straps completely flat so that they are at least one meter higher than the roof of the shed

    Carefully lift the post with a crane and place it on the vehicle

    During the route, avoid turning and sudden braking because it will change the condition of the garage and cause an accident

    During the route, avoid turning and sudden braking because it will change the condition of the garage and cause an accident

    If it is not level, use level plates to level the set, otherwise the door adjustment will be messed up and irreparable blows will be inflicted on the doors.

    Place the post gently on the platform so as not to damage its internal equipment

    To connect to the foundation, weld the straps installed in the four corners of the chassis to the foundation column plates.

    Be careful not to weld the post on the plated chassis

    It is designed to connect the input cables to the manhole valve panel for the passage of the operator

    In order to earth the door of the cells or connect and disconnect the keys, be sure to read the instructions installed on the device

    After performing the operation, put the disconnecting and connecting handle in the right place

    At the end of the work, padlocks should be used for the security of the post equipment